Home / Services / Material Quantity Takeoff
Material take-offs

Material Take-off Services in Perth and WA

Perth and Western Australia

Accurate material quantities measured from your drawings for builders, contractors and estimators, so you can price faster and tender with confidence.

RICS Accredited AIQS Accredited Bluebeam certified Perth, WA
Construction drawings and measurement tools Measured from your drawings
Trusted by construction companies across Australia
Built construction company logo ERTECH construction company logo Lendlease construction company logo Georgiou construction company logo Perkins construction company logo Whittens construction company logo
The solution

Material take-offs built for faster, more accurate tender pricing

Our material quantity takeoff service helps builders, contractors and estimators measure quantities accurately from drawings, reduce pricing gaps and prepare stronger tender submissions.

Missing quantities create price gaps, manual take-offs slow tender deadlines, inconsistent BOQs make supplier quotes hard to compare, and overlooked materials reduce your margin. A professional take-off deals with all four.

What you get

Trade-by-trade quantitiesMarked-up drawingsBOQ-ready outputsAssumption notesRevision support
What’s included

What a construction material take-off includes

A material take-off lists every material needed to build the job, measured from your drawings and grouped so you can price and order it.

01

Concrete & reinforcement

Footings, slabs, piers and columns (m³), mesh and bar.

02

Masonry

Bricks and blocks by wall type, lintels, ties and mortar.

03

Framing & roofing

Timber or steel members, roof cover, sarking, gutters and flashings.

04

Linings & finishes

Plasterboard, render, tiling, waterproofing and paint areas.

05

Doors, windows & fixtures

Counted from the drawings and schedules.

06

Civil & external works

Earthworks volumes, pavements, kerbs, drainage and paving.

07

Fast turnaround

An efficient process gets you detailed, checked work quickly, so you stay on schedule. We confirm a timeline for your project up front.

Every quantity is marked up on the drawings, so you can see exactly what was measured and check it against revisions.

Trade by trade

Take-offs for the trades you price

Choose a trade to see the problem we solve for builders, subcontractors and suppliers, how we solve it, the result you get and how we measure it.

Concrete & reo

Volumes and tonnages measured as they’ll be poured and fixed.

The problem

Concrete and reo are often measured in a hurry from structural drawings that keep changing. Thickenings, set-downs and edge beams get missed, reo is guessed from a rule of thumb, and the order comes up short on pour day or the margin disappears in waste.

Our solution

We measure slabs, footings, beams, walls and columns in Bluebeam the way they’ll be poured, including thickenings and set-downs. Reinforcement is taken off by bar size and element, with mesh, laps and bar chairs allowed for, and both are set out in schedules that suit ordering and pricing.

The result you get

Quantities you can order from and price with confidence. You get pour-by-pour volumes and reo tonnages that trace back to marked-up drawings, so your team, your supplier and your client can all check the same numbers.

How we do it
  • Colour-coded Bluebeam take-offs of every element
  • Volumes split by element, floor or pour where needed
  • Reo by bar size and element, including mesh, laps and chairs
  • Excel schedules ready for supplier quotes

Formwork

Contact areas by type, with propping and reuse in mind.

The problem

Formwork quantities are often lumped into one area figure, which hides the difference between a simple slab edge and a tall wall or column. Without types, heights and propping broken out, labour gets underpriced, hire periods run long and formwork becomes the package that hurts.

Our solution

We measure formwork contact areas from the drawings and break them down by type: slab edges, soffits, walls, columns and beams. Heights are noted, along with where propping or back-propping is needed, so your formwork team can plan reuse, choose systems and price labour against what will really be built.

The result you get

A formwork take-off you can plan and price from, not just a single number. You see where the hard work is, how much gear the job needs and where reuse is possible, which makes it easier to weigh up hire against buy and settle on a sensible price.

How we do it
  • Contact areas measured in Bluebeam by type and element
  • Heights and propping zones noted from the drawings
  • Quantities grouped to help plan reuse and sequencing
  • Excel outputs ready for labour and hire pricing

Framing & structural steel

Members, lengths and connections counted, not estimated.

The problem

Timber and steel framing take-offs are slow and fiddly. Counting studs, plates, lintels, purlins and connections across dozens of sheets under a tender deadline leads to missed members, double-counted runs and orders that arrive short or leave a pile of offcuts.

Our solution

We measure framing and structural steel member by member from the architectural and structural drawings. Members are scheduled by size, grade and length, with lintels, bracing, purlins, girts and connections listed, so suppliers and fabricators can quote from a clear, consistent list.

The result you get

A schedule you can send to suppliers for quotes, and numbers you can check against the drawings. That means fewer missed members, less waste on site, and a framing or steel price that holds up when the job is built.

How we do it
  • Member-by-member take-offs in Bluebeam
  • Schedules by size, grade and length
  • Lintels, bracing, purlins, girts and connections listed
  • Marked-up drawings so every member can be traced

Finishes

Every room and surface measured, ready to price.

The problem

Finishes look simple until you price them. Floor, wall and ceiling finishes change room by room, wet areas need waterproofing, and skirtings, trims and set-outs get missed. Small misses across a whole building add up, and they usually show up after the job is won.

Our solution

We measure finishes room by room from the plans, elevations and finishes schedule: flooring, wall tiling, painting, ceilings, waterproofing, skirtings and trims. Each item is tagged to its finish type and location, so you can price by trade, send packages to subcontractors and check what each quote includes.

The result you get

A finishes take-off that matches the finishes schedule and the way the building will be fitted out. You can price with confidence, compare subcontractor quotes like for like and avoid paying for missed scope once work is underway.

How we do it
  • Room-by-room measurement in Bluebeam
  • Quantities tagged by finish type and location
  • Waterproofing, skirtings, trims and set-outs included
  • Excel schedules grouped by trade package
Our methodology

Our simple material take-off process

A clear process to send drawings, confirm scope and receive accurate material quantities for tender pricing.

  • Bluebeam. Marked-up measurement drawings and PDF plan review.
  • Cost X. Digital quantity extraction, cost planning and take-off measurement.
  • Excel. Custom quantity schedules, supplier comparisons and BOQ-ready outputs.
  • Databuild. Residential estimating.
  • Primavera P6. Programme and scheduling information where it supports cost and planning decisions.
Software we use: Bluebeam, CostX, Excel and DatabuildSoftware we use
01

Send drawings and scope

Share your construction drawings, project scope, trade requirements and tender deadline with our team.

02

We measure quantities and clarify assumptions

Our quantity surveyors review the drawings, measure the quantities and note any assumptions, exclusions or scope gaps.

03

Receive marked-up take-off and BOQ-ready quantities

Clear material quantities you can use for supplier quotes, tender pricing and project budgeting.

Why it pays

How a professional take-off saves you money

01

Sharper tenders

Accurate quantities let you price competitively without guessing at contingencies.

02

Less waste

Order quantities match what is needed, with realistic allowances for cuts and breakages.

03

Fewer missed items

Scope gaps between trades are picked up before you price, not on site.

04

More tenders, same team

Outsourcing the measurement frees estimators and project managers to price and win work.

05

Easier revisions

A traceable take-off makes it simple to show what changed between drawing revisions.

06

Works with your suppliers

We align take-offs with your suppliers’ requirements and delivery timelines.

For quick checks on site, try our free concrete, brickwork and tile calculators. For a full job, call 0498 202 445.

What our clients say

Feedback from builders and contractors

Great communicators with quick turnaround times for take offs.
Australian Bridge Products
Great to deal with Alastair. Much appreciate what you accomplished doing our take offs.
Clearform
You met my expectation and we confirmed the accuracy of your calculations.
Streater Group
Accreditations
RICS logo
AIQS logo
  • RICS Accredited
  • AIQS Accredited
  • Bluebeam certified

Need quantities for your next tender?

Send through your drawings, scope, trade requirements and tender deadline, and we’ll confirm the scope and a timeline for your take-off.

Contact
Alastair Carey, Director
Phone
0498 202 445
Email
info@measuremanage.com.au
Location
Perth, Western Australia
Alastair Carey, Director, Measure Manage
FAQ

Frequently asked questions

What is a material and quantity takeoff?

A detailed calculation of the materials, equipment and labour needed for a construction project.

How accurate are your takeoff services?

Our take-offs are highly accurate, thanks to on-screen measurement software, marked-up drawings and a check before delivery.

How quickly can you deliver takeoffs?

Timelines depend on project size. We offer a fast turnaround and confirm a delivery date with you up front.

Do you cater to all types of construction projects?

Yes, we handle residential, commercial and civil projects across Perth and regional WA.

Can you work with our existing suppliers?

Absolutely. We align our take-offs with your suppliers’ requirements and delivery timelines.

Why outsource takeoff services?

Outsourcing to Measure Manage saves time, improves accuracy and lets you focus on core project activities.

What’s included in a consultation?

We discuss your project goals, challenges and requirements, and outline how we can tailor our services to meet your needs.